We had resin laid 5 years ago. The firm dug out the old drive, laid and compacted some hardcore, installed some drainage channels including a soak away, then laid 4 inches of reinforced concrete and then floated 17mm resin. Came with a 10 year warranty, but only because they laid the concrete...