Oneball
Member
- Messages
- 11,130
Roof panels and doors now striped, one more bodged repair to fix.
Hopefully as people are starting to go back to work the balancing shop will be open soon, so damper and pulley cleaned and painted
Compression rings checked for gap
And filed to spec
Oil rings checked too
Piston and rod cleaned
And assembled
Only 7 more to go, 4 cylinder engines new have some advantages!
Hopefully as people are starting to go back to work the balancing shop will be open soon, so damper and pulley cleaned and painted
Compression rings checked for gap
And filed to spec
Oil rings checked too
Piston and rod cleaned
And assembled
Only 7 more to go, 4 cylinder engines new have some advantages!