Well job pretty much done, only need to bleed brakes and have final re-torque, then alignment if a dry road anytime soon.
As with most jobs it took a bit longer than I though but definitely needed doing.
As well as the frame I replaced the one upper wishbone, remaining front rigid brake pipes, (Goodridge braided lines new last year), roll bar bushes and drop links, track rod ends, various pipe clips, brackets, jubilee clips etc etc. Plus the blasting and powder coating of springs, roll bar and loads of small parts covered in surface corrosion.
Jobs for next year.
Replace:
Replace fuel vapour line that runs length of car, surface corrosion.
Replace fuel pipes, surface corrosion again.
Brake calliper overhaul and powder coat (probably red)
Maybe wheel refurb in grigio
Had enough this time round.
Merry Christmas all.
Cheers Greg